Author Archive

North High School/Middle School

Posted by

Deig Bros. was awarded the Mechanical and Geothermal packages from the Evansville Vanderburgh School Corporation in January of 2010.

Hydronic Piping

These multi-million dollar packages were part of a massive school project at the far north side of Evansville, Indiana.

From geothermal wells to unique pipe curvatures in arched corridors, the complex installation processes required the finest craftsmanship.

Deig Bros. was also responsible for the coordination of the MEP (Mechanical, Electrical, and Plumbing) prime contractors. Rick Cates orchestrated the Deig Bros. crew productively and also coordinated the MEP Primes onsite.

The Ford Center – Downtown Arena

Posted by

Deig Bros. was responsible for the Concrete Superstructure and the Drywall/Door portions of the Ford Center in Downtown Evansville.

This was a massive project that Deig Bros. completed under the field supervision of Tom Petrig and Curt Goebel. Unique in its scope, the project required strong coordination with other contractors in order to successfully accomplish this huge endeavor. Hunt Construction was the General Contractor and the design was originated from Populous Architecture.